(Couldn't take a proper photo because it was hailing.)
Saturday, 10 November 2018
We've got a Slab!
We hired an independent inspector for every stages. The first inspection was the Pre-pour inspection. It was performed by Darbecca on Monday Nov 5. Some issues were reported and sent to our site supervisor. All issues were minor and rectified before the slab pour. This is how it looks like now after the slab was poured.
Subscribe to:
Post Comments (Atom)
Frame Stage
Immediately after the slab was poured, we've moved to the Frame Stage. Frame for the ground floor is up! How exciting to see that it...

-
We hired an independent inspector for every stages. The first inspection was the Pre-pour inspection. It was performed by Darbecca on Mond...
-
It was not our original plan but, yes, we decided to build a house this year. The original plan was for the whole family to move to Melbou...
No comments:
Post a Comment